- 100 TPD modular gold tailings processing plant
- Grinding, processing, and concentration circuits
- Stored in 4 shipping containers
- Designed as 5 modules
- Combination of new and used equipment
- Winnermac STL30 centrifugal concentrator with 5 HP motor, and spare unit
- Compartment for 1 ton supersack for concentrates
- 1.5 x 1 inch pump
- 4x10 ft ball mill, test use only
- steel liners
- 3.5 ton ball charge
- 36 RPM operational speed
- 2x4 ft magnetic drum separator
- Benshaw speed controller
- 8 Winnermac flotation cells
- 18 cu ft cells, Denver style
- 5 HP motor
- 3 agitated concentrated storage tanks
- 6 x 15 ft Winnermac double deck gold concentration table
- 6 x 15 ft Winnermac double deck gold table
- PMPC electrowinning cell
- 25 Kw rectifier
- 100 ADC Aldonex air cooled power supply
- B160 propane gold smelting furnace
Also included:
- 3x8 ft rotary trommel screen with 1/4 in mesh
- Unused cyclone dust collector
- 8in x 6 ft sand screw
- Unused 1 inch chemical pump
- Topaz oxygen concentrator
- Carbon filters
- two 20 ton feed hoppers
- 110 gal waste oil tank
- 4 inch pneumatic sampler
- 100 kw generator set
- vibratory feeder
- 18 in x 26 ft conveyors
Disassembly, match marking, and loading at additional cost